How to install the Soft Leaf Board
The installation method of Soft Leaf Board may vary depending on the application scenarios (such as walls, ceilings, partitions, etc.). Below is a detailed introduction to the installation methods of Soft Leaf Board in different scenarios:
Wall installation
Grassroots treatment: Ensure that the wall base is flat, dry, free of cracks and looseness. If the wall surface is uneven, it needs to be leveled with putty first. After the putty dries, it should be sanded smooth with sandpaper to ensure that the Soft Leaf Board can tightly adhere to the wall surface.
Measurement and planning: Based on the size of the soft leaf board and the actual size of the wall, measure and layout planning, determine the laying direction and splicing method of the soft leaf board, minimize cutting and waste, and ensure the continuity and aesthetics of the pattern or texture.
Adhesive installation (small area): For the installation of Soft Leaf Board with smaller areas, adhesive installation can be used. Select a specialized environmentally friendly adhesive suitable for the material of the Soft Leaf Board, evenly apply the adhesive to the back of the Soft Leaf Board and the wall surface, wait for the adhesive to dry slightly until it has a certain degree of viscosity, accurately adhere the Soft Leaf Board to the wall surface, gradually squeeze from one end to the other, and exhaust the air to ensure that the Soft Leaf Board is fully bonded to the wall surface without hollowing.
Hanging installation (large area): When installing Soft Leaf Board on a large area, hanging installation is more secure and convenient. Firstly, install the keel on the wall. The keel can be made of wood or metal material, and the spacing and specifications of the keel are determined according to the size and weight of the soft leaf board. Fix the keel horizontally and vertically on the wall to ensure a smooth surface. Then, pre install hooks or pendants on the Soft Leaf Board to match the corresponding position on the keel, hang the Soft Leaf Board on the keel, adjust the position to ensure a firm and flat installation.
Ceiling installation
Keel construction: Build the ceiling keel frame according to the design plan, commonly including light steel keel or wooden keel. The spacing of the keel should be reasonably set according to the size and weight of the soft leaf board. Generally, the spacing should not be too large to ensure the stability and load-bearing capacity of the ceiling. Ensure that the keel is installed horizontally and connected firmly.
Soft blade plate fixation: Place the soft blade plate on the keel according to the predetermined shape and layout, and various fixation methods can be used. If the Soft Leaf Board is thin and has a soft texture, special ceiling nails can be used to fix it to the keel. When nailing, attention should be paid to uniform force to avoid damaging the soft leaf panel; For heavier or larger sized flexible blades, screws or buckles may be required to secure them tightly to the keel, ensuring that they do not loosen or fall off. During the fixing process, attention should be paid to the splicing and connection between the Soft Leaf Board to ensure overall flatness and aesthetics.
Partition installation
Fixed partition installation: If a fixed partition is made, the installation method is similar to wall installation. Firstly, according to the design position and size of the partition, fixed tracks or slots are installed on the ground and ceiling as the support structure for the Soft Leaf Board. Then install the soft blade plates in the track or slot one by one, and firmly fix them with glue, screws, or other fasteners to ensure the stability and verticality of the partition.
Installation of activity partitions: Activity partitions require the installation of corresponding track and pulley systems. Accurately install tracks on the ground and ceiling, ensuring that the tracks are level and smooth to ensure that the partitions can move smoothly. Install matching pulleys at the bottom and top of the soft blade board, and the quality and installation accuracy of the pulleys directly affect the flexibility of the partition. Install the soft blade plate with installed pulleys on the track, conduct debugging, check whether the partition moves smoothly, whether the switch is flexible, and make minor adjustments as needed. At the same time, positioning devices should be set up to accurately fix the partition in both open and closed states.
Regardless of the installation method, the installation effect of the soft blade plate should be carefully checked after installation to ensure that it is firm, flat, and aesthetically pleasing. If necessary, make appropriate modifications and treatments to the edges and interfaces.